Paradyne 8540 Instrukcja Użytkownika

Przeglądaj online lub pobierz Instrukcja Użytkownika dla Networking Paradyne 8540. Paradyne 8540 User's Manual Instrukcja obsługi

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj

Podsumowanie treści

Strona 1 - 8546 DSL CARDS

HOTWIRE DSLAM FOR 8540 AND8546 DSL CARDSUSER’S GUIDEDocument No. 8000-A2-GB20-20

Strona 2 - Printed on recycled paper

About This Guide ix8000-A2-GB20-20November 1997Section DescriptionGlossary Defines acronyms and terms used in this document.Index Lists key terms, acr

Strona 3 - Contents

Monitoring the HotWire DSLAM 7-128000-A2-GB20-20November 1997MCC IP Router ScreensUse the system information submenu of the IP Router screens to displ

Strona 4 - 5 MCC Card Configuration

Monitoring the HotWire DSLAM 7-138000-A2-GB20-20November 1997Table 7-5. IP Router Menu Options (2 of 3)Routing Information WindowIn addition, the lowe

Strona 5 - 6 DSL Card Configuration

Monitoring the HotWire DSLAM 7-148000-A2-GB20-20November 1997Table 7-5. IP Router Menu Options (3 of 3)Filter Table B-E-CDisplays the various filters

Strona 6 - November 1997

Monitoring the HotWire DSLAM 7-158000-A2-GB20-20November 19972. The Card Status menu appears. Select the submenu option as shown inTable 7-6 and press

Strona 7

Monitoring the HotWire DSLAM 7-168000-A2-GB20-20November 1997DSL Monitoring Physical Layer ScreensUse the system information submenu of the Physical L

Strona 8 - About This Guide

Monitoring the HotWire DSLAM 7-178000-A2-GB20-20November 1997Table 7-7. Physical Layer Options (2 of 5)Ether Statistics (Ethernet Statistics) B-B-BDis

Strona 9 - Document Summary

Monitoring the HotWire DSLAM 7-188000-A2-GB20-20November 1997Table 7-7. Physical Layer Options (3 of 5)Ether Statistics (Ethernet Statistics) (continu

Strona 10 - Product-Related Documents

Monitoring the HotWire DSLAM 7-198000-A2-GB20-20November 1997Table 7-7. Physical Layer Options (4 of 5)DSL Link Perf (DSL Link Performance Summary) B-

Strona 11 - Description

Monitoring the HotWire DSLAM 7-208000-A2-GB20-20November 1997Table 7-7. Physical Layer Options (5 of 5)DSL Error Stats B-B-FDisplays the error perform

Strona 12 - HotWire DSLAM Components

Monitoring the HotWire DSLAM 7-218000-A2-GB20-20November 1997DSL Monitoring Interfaces ScreensUse the system submenu information of the Interfaces scr

Strona 13 - -48V (B)

1-18000-A2-GB20-20November 1997HotWire DSLAM SystemDescription1What is the HotWire DSLAM?The HotWire Digital Subscriber Line Access Multiplexer (DSLA

Strona 14 - Levels of Access

Monitoring the HotWire DSLAM 7-228000-A2-GB20-20November 1997DSL Network Protocol ScreensUse the system submenu information of the Network Protocol sc

Strona 15 - Monitoring the System

Monitoring the HotWire DSLAM 7-238000-A2-GB20-20November 1997Table 7-9. Network Protocol Options (2 of 7)UDP Statistics B-D-BDisplays information on U

Strona 16 - Diagnostics and

Monitoring the HotWire DSLAM 7-248000-A2-GB20-20November 1997Table 7-9. Network Protocol Options (3 of 7)TCP Data Stats (TCP Data Statistics) B-D-CDis

Strona 17 - HotWire Menus and Screens

Monitoring the HotWire DSLAM 7-258000-A2-GB20-20November 1997Table 7-9. Network Protocol Options (4 of 7)TCP Connection Statistics B-D-CDisplays a sum

Strona 18 - Menu and Screen Formats

Monitoring the HotWire DSLAM 7-268000-A2-GB20-20November 1997Table 7-9. Network Protocol Options (5 of 7)ICMP Statistics (ICMP Packet Statistics) B-D-

Strona 19

Monitoring the HotWire DSLAM 7-278000-A2-GB20-20November 1997Table 7-9. Network Protocol Options (6 of 7)SNMP Authentication Statistics (continuation

Strona 20 - Card Selection Screen

Monitoring the HotWire DSLAM 7-288000-A2-GB20-20November 1997Table 7-9. Network Protocol Options (7 of 7)PPP Stats (General) B-D-H (A)Displays a summ

Strona 21 - Commonly Used Navigation Keys

Monitoring the HotWire DSLAM 7-298000-A2-GB20-20November 1997DSL IP Router ScreensUse the system submenu information of the IP Router screens to displ

Strona 22 - 97-15566

Monitoring the HotWire DSLAM 7-308000-A2-GB20-20November 1997Table 7-10. IP Router Options (2 of 3)Routing Table (continued) B-E-ARouting Information

Strona 23 - HotWire – MCC Menu

Monitoring the HotWire DSLAM 7-318000-A2-GB20-20November 1997Table 7-10. IP Router Options (3 of 3)Filter Table B-E-CDisplays the various filters that

Strona 24

HotWire DSLAM System Description 1-28000-A2-GB20-20November 1997Legend: DSL - Digital Subscriber Line RTU - Remote Termination UnitMDF - Main Distribu

Strona 25 - HotWire – MCC menu

Monitoring the HotWire DSLAM 7-328000-A2-GB20-20November 1997DSL Configuration RTU ScreensUse the system information sub-menu of the RTU screens to di

Strona 26 - HotWire – DSL Menu

8-18000-A2-GB20-20November 1997Diagnostics and Troubleshooting8Applications ScreensUse the Applications submenu to perform a Ping, TraceRoute, or Tel

Strona 27

Diagnostics and Troubleshooting 8-28000-A2-GB20-20November 19973. The Applications menu appears. Select the submenu option and enter thedesired value

Strona 28 - Configured)

Diagnostics and Troubleshooting 8-38000-A2-GB20-20November 1997Diagnostic ScreensUse the Diagnostics submenu to perform self-tests or view alarm statu

Strona 29 - Operator Login Screen

Diagnostics and Troubleshooting 8-48000-A2-GB20-20November 1997Table 8-2. Diagnostics Options Selftest D-ADisplays the results of the last disruptive

Strona 30

Diagnostics and Troubleshooting 8-58000-A2-GB20-20November 1997TroubleshootingThe status of each card in the HotWire DSLAM is indicated on the Card Se

Strona 31 - Procedure

Diagnostics and Troubleshooting 8-68000-A2-GB20-20November 1997Checking AlarmsIf the Card Selection screen indicates that a Major or Minor Alarm is on

Strona 32 - Exiting From the System

Diagnostics and Troubleshooting 8-78000-A2-GB20-20November 1997Table 8-3. Major Alarms (2 of 2)Failure Type ActionEthernet portfailure1. Check cable c

Strona 33 - Initial Setup Instructions

Diagnostics and Troubleshooting 8-88000-A2-GB20-20November 1997Minor AlarmsUse Table 8-4 to determine the appropriate action to take for each Minor Al

Strona 34

Diagnostics and Troubleshooting 8-98000-A2-GB20-20November 1997Failure Type ActionError RateThreshold (A trapmessage sent ifthe Block ErrorRate averag

Strona 35 - Additional Setup Instructions

HotWire DSLAM System Description 1-38000-A2-GB20-20November 1997For more information about the HotWire 8600 DSLAM chassis, see theHotWire 8600 Digital

Strona 36 - What’s Next?

Diagnostics and Troubleshooting 8-108000-A2-GB20-20November 1997Network ProblemsReview the following symptoms and possible solutions to help in solvin

Strona 37 - Configuring the HotWire DSLAM

Diagnostics and Troubleshooting 8-118000-A2-GB20-20November 1997Slow PerformancePROBLEM: Performance is slow.ACTION: 1. Verify that there are enough b

Strona 38 - Network Configuration Guide

Diagnostics and Troubleshooting 8-128000-A2-GB20-20November 1997No SNMP Connection EstablishedPROBLEM: Cannot establish an SNMP session/connection.ACT

Strona 39 - On the . . . See . .

Diagnostics and Troubleshooting 8-138000-A2-GB20-20November 1997IP Routing ProblemsPROBLEM: Stations cannot communicate through the router.Incorrect I

Strona 40 - MANAGEMENT DOMAIN

Diagnostics and Troubleshooting 8-148000-A2-GB20-20November 1997System Does Not Recognize New DSL CardsPROBLEM: System does not recognize new DSL card

Strona 41 - SERVICE DOMAIN

Diagnostics and Troubleshooting 8-158000-A2-GB20-20November 1997Cannot Upload Configurations to a Unix ServerPROBLEM: TFTP server denies write permiss

Strona 42 - Setting Time and Date Screen

A-18000-A2-GB20-20November 1997Checklist for Setting Up UserAccounts on the MCC and DSL CardsAOverviewUser accounts provide security for the DSLAM by

Strona 43

Checklist for Setting Up User Accounts on the MCC and DSL Cards A-28000-A2-GB20-20November 1997Reboot Card (MCC)Use the following checklist to reboot

Strona 44

Checklist for Setting Up User Accounts on the MCC and DSL Cards A-38000-A2-GB20-20November 1997Reboot Card (DSL)Use the following checklist to reboot

Strona 45

B-18000-A2-GB20-20November 1997Checklist for Setting Up SNMPFeaturesBSetting Up SNMP FeaturesUse the following checklist when setting up SNMP feature

Strona 46 - 0.0.0.0

HotWire DSLAM System Description 1-48000-A2-GB20-20November 1997FeaturesThe HotWire DSLAM system provides the following features: High speed Internet

Strona 47 - Resetting the MCC Card

Checklist for Setting Up SNMP Features B-28000-A2-GB20-20November 1997Management System Source Validation for DSL cardsFrom the DSL Main Menu, select

Strona 48

C-18000-A2-GB20-20November 1997Download Code and ApplyDownloadCThe Download Code menu option on the HotWire DSLAM gives you the ability toupgrade you

Strona 49

Download Code and Apply Download C-28000-A2-GB20-20November 1997Scenario Two: Download Only SystemIn order for the system to become fully functional a

Strona 50

D-18000-A2-GB20-20November 1997Navigation KeysDThe following table lists navigation keys and their definitions. These commandsare used to move around

Strona 51 - Resetting the DSL Card

E-18000-A2-GB20-20November 1997TrapsETraps are configured via a Telnet or terminal session. The addition or removal ofa card or another hardware comp

Strona 52

Traps E-28000-A2-GB20-20November 1997Event CommentTrap ClassEthernet link down major —Ethernet link up normal —xDSL margin low minor Margin estimate b

Strona 53

Traps E-38000-A2-GB20-20November 1997The MCC card sends the following traps.EventTrap Class CommentDevice failure major —Self test failure minor Sent

Strona 54

Traps E-48000-A2-GB20-20November 1997RTU Related TrapsThe RTUs send the following traps. For a listing of Paradyne Enterprise MIBS,see Chapter 8 of th

Strona 55 - MCC Card Configuration

F-18000-A2-GB20-20November 19975446 RTU SetupF5446 RTU OverviewThe RADSL 5446 RTU has an IP configuration table that is updated through anSNMP agent.

Strona 56

5446 RTU Setup F-28000-A2-GB20-20November 1997IP Injection ToolThis tool is available from Paradyne’s Power Pages World Wide Web site. Theprogram is i

Strona 57

HotWire DSLAM System Description 1-58000-A2-GB20-20November 1997Configuring the SystemThe HotWire DSLAM software provides configuration submenu option

Strona 58 - Download Code and

5446 RTU Setup F-38000-A2-GB20-20November 1997Windows 95 syntax example: NMS = 135.90.51.1 MCC card = 135.90.51.220 on the same subnet as the NMS 13

Strona 59 - (Reserved for Future Use)

5446 RTU Setup F-48000-A2-GB20-20November 1997 ProcedureFrom an SNMP workstation:1. To load the MIB, access the Paradyne World Wide Web site:http://w

Strona 60

5446 RTU Setup F-58000-A2-GB20-20November 19975446 RTU IP Configuration TableHost routes use the IP address assigned to the end-user systems supported

Strona 61

5446 RTU Setup F-68000-A2-GB20-20November 1997Table F-1. IP Injection Group Objects (ipInjectionTable 1)ObjectDescription Setting/ContentsipInjectionT

Strona 62

G-18000-A2-GB20-20November 1997Static Route Warning MessagesGThe following table lists warnings and error messages displayed on the StaticRoutes scre

Strona 63

GL-18000-A2-GB20-20November 1997GlossaryAn Ethernet LAN that works on twisted-pair wiring.A symbol (usually numeric) that identifies the interface att

Strona 64

GlossaryGL-28000-A2-GB20-20November 1997Digital Subscriber Line Access Multiplexer. DSLAM provides simultaneous high-speeddigital data access and anal

Strona 65

GlossaryGL-38000-A2-GB20-20November 1997DSL margin is defined as the additional noise measured in db that would need to be addedto (or if the margin i

Strona 66 - " Procedure

GlossaryGL-48000-A2-GB20-20November 1997A special purpose, dedicated computer that attaches to two or more networks andforwards packets from one to th

Strona 67

IN-18000-A2-GB20-20 November 1997IndexNumbers10BaseT interface on the MCC and DSL cards (e1a),4-1AActive Interfaces List screen, 7-5, 7-21Active Lis

Strona 68 - MCC DSL Cards Screen

HotWire DSLAM System Description 1-68000-A2-GB20-20November 1997Troubleshooting and DiagnosticsThe HotWire DSLAM system provides diagnostic submenu op

Strona 69 - DSL Card Configuration

IndexIN-28000-A2-GB20-20November 1997LLogical Entities screen, 5-12, 6-16MManagement Communications Controller card, 1-3Martian Networks screen, 5

Strona 70

IndexIN-38000-A2-GB20-20 November 1997TTelnet screen, 8-2Time/Date screen, 4-6, 5-3, 6-3Traps, E-1traps, SNMP, E-4– E-7Troubleshooting, 8-5Cann

Strona 71

2-18000-A2-GB20-20November 1997HotWire Menus and Screens2OverviewThe HotWire DSLAM has a menu- and screen-driven user interface system thatenables th

Strona 72

HotWire Menus and Screens 2-28000-A2-GB20-20November 1997Menu and Screen FormatsThe HotWire DSLAM uses an ASCII-based text format for its menus and sc

Strona 73 - Download and Apply Download

HotWire Menus and Screens 2-38000-A2-GB20-20November 1997Components of a HotWire ScreenA typical HotWire screen looks like this:21431. System Header L

Strona 74

Printed on recycled paper A8000-A2-GB20-20November 1997Copyright  1997 Paradyne Corporation.All rights reserved.Printed in U.S.A.NoticeThis publicati

Strona 75

HotWire Menus and Screens 2-48000-A2-GB20-20November 19972. Display Area is the top portion of the screen on which pertinent DSLAMsystem information i

Strona 76

HotWire Menus and Screens 2-58000-A2-GB20-20November 1997Commonly Used Navigation KeysThe following table lists the most commonly used navigation keys

Strona 77

HotWire Menus and Screens 2-68000-A2-GB20-20November 1997HotWire Menus: A Hierarchical ViewThis section describes the menu structure of the HotWire us

Strona 78

HotWire Menus and Screens 2-78000-A2-GB20-20November 1997HotWire – MCC MenuAfter selecting the MCC card from the Card Selection screen, the DSLAM syst

Strona 79

HotWire Menus and Screens 2-88000-A2-GB20-20November 1997The following figure illustrates the complete Configuration menu hierarchy fromthe HotWire –

Strona 80

HotWire Menus and Screens 2-98000-A2-GB20-20November 1997The following figure illustrates the complete Monitoring menu hierarchy from theHotWire – MCC

Strona 81

HotWire Menus and Screens 2-108000-A2-GB20-20November 1997HotWire – DSL MenuAfter selecting a specific DSL card from the Card Selection screen, the DS

Strona 82

HotWire Menus and Screens 2-118000-A2-GB20-20November 1997The following figure illustrates the complete Configuration menu hierarchy fromthe HotWire –

Strona 83

HotWire Menus and Screens 2-128000-A2-GB20-20November 1997The following figure illustrates the complete Monitoring menu hierarchy from theHotWire – DS

Strona 84

HotWire Menus and Screens 2-138000-A2-GB20-20November 1997Reviewing the Levels of AccessThere are two levels of privileges on the HotWire DSLAM system

Strona 85

i8000-A2-GB20-20November 1997ContentsAbout This Guide Document Purpose and Intended Audience vi. . . . . . . . . . . . . . . . . . . . . . . . . 

Strona 86

HotWire Menus and Screens 2-148000-A2-GB20-20November 1997Card Selection ScreenFrom the HotWire Chassis Main Menu, select Card Selection to display th

Strona 87 - nnn.nnn.nnn.nnn

HotWire Menus and Screens 2-158000-A2-GB20-20November 1997Position DescriptionDisplay7 d3 (DSL)# Status of DSL card Port 3 (U=UP, D=Down,or X=Disabled

Strona 88

HotWire Menus and Screens 2-168000-A2-GB20-20November 1997Accessing the HotWire – DSL Menu and Selecting a Specific DSL CardProcedureTo access the Ho

Strona 89

3-18000-A2-GB20-20November 1997Initial Setup Instructions3OverviewThis chapter provides instructions on how to access the system for the first timean

Strona 90

Initial Setup Instructions 3-28000-A2-GB20-20November 1997 ProcedureTo set the management IP address and subnet mask from the console terminal:1. Pow

Strona 91

Initial Setup Instructions 3-38000-A2-GB20-20November 19973. Do one of the following at the (nnn.nnn.nnn.nnn): prompt:— To accept the subnet mask, pre

Strona 92

Initial Setup Instructions 3-48000-A2-GB20-20November 1997Chassis Information ScreenProcedure1. Choose Chassis Info from the HotWire Chassis Main Men

Strona 93

4-18000-A2-GB20-20November 1997Configuring the HotWire DSLAM4OverviewThe HotWire DSLAM enables you to configure and manage the HotWire MCCand DSL car

Strona 94 - MCC Network Protocol Screens

Configuring the HotWire DSLAM 4-28000-A2-GB20-20November 1997Configuring MCC Cards, DSL Cards, and RTUsUse the procedures in the following order to co

Strona 95

Configuring the HotWire DSLAM 4-38000-A2-GB20-20November 1997For each Service Domain,perform task . . .On the . . . See . . .1. Configure a static rou

Strona 96

Contents ii8000-A2-GB20-20November 19973 Initial Setup Instructions Overview 3-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Strona 97

Configuring the HotWire DSLAM 4-48000-A2-GB20-20November 1997The following illustrates the management domain components that must beconfigured and exa

Strona 98

Configuring the HotWire DSLAM 4-58000-A2-GB20-20November 1997The following illustrates the service domain components that must be configuredand exampl

Strona 99

Configuring the HotWire DSLAM 4-68000-A2-GB20-20November 1997Setting Time and Date ScreenWhen you select Time/Date from the Card Status menu, the Time

Strona 100 -  Procedure

Configuring the HotWire DSLAM 4-78000-A2-GB20-20November 1997Assigning IP Addresses to the Backplane on the MCC CardUse this procedure to create a sep

Strona 101 - Monitoring the HotWire DSLAM

Configuring the HotWire DSLAM 4-88000-A2-GB20-20November 1997Assigning IP Addresses to the DSL Cards on the MCC CardUse this procedure to define addre

Strona 102 - DSL Monitoring Menu Tree

Configuring the HotWire DSLAM 4-98000-A2-GB20-20November 1997Creating SNMP Community Strings and Authentication Failure TrapUse this procedure to conf

Strona 103 - Table 7-6 and press Return

Configuring the HotWire DSLAM 4-108000-A2-GB20-20November 1997Creating the Default RouteUse this procedure to create the default route to the manageme

Strona 104

Configuring the HotWire DSLAM 4-118000-A2-GB20-20November 1997Resetting the MCC CardAfter configuring the MCC card, reset the MCC card to install the

Strona 105

Configuring the HotWire DSLAM 4-128000-A2-GB20-20November 1997Configuring 5446 RTU IP Host Addresses on the 8546 DSL CardUse this procedure to assign

Strona 106

Configuring the HotWire DSLAM 4-138000-A2-GB20-20November 1997Configuring a Static Route to an NMS on each DSL CardUse this procedure to enable the ma

Strona 107

Contents iii8000-A2-GB20-20November 19976 DSL Card Configuration Overview 6-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Strona 108

Configuring the HotWire DSLAM 4-148000-A2-GB20-20November 1997Assigning IP Addresses to the DSL Card LANUse this procedure to give DSL cards a LAN Int

Strona 109

Configuring the HotWire DSLAM 4-158000-A2-GB20-20November 1997Resetting the DSL CardAfter configuring all of the service domain IP addresses on a DSL

Strona 110 - DSL Network Protocol Screens

Configuring the HotWire DSLAM 4-168000-A2-GB20-20November 1997Configuring Static Routes to End Users on each DSL CardUse this procedure to enable the

Strona 111

Configuring the HotWire DSLAM 4-178000-A2-GB20-20November 1997Configuring DHCP Relay Agent (dynamic addressing)Use this procedure to provide dynamic S

Strona 112 - Right column:

Configuring the HotWire DSLAM 4-188000-A2-GB20-20November 1997Creating Default Route or Source Route on the DSLUse this procedure to create a default

Strona 113

5-18000-A2-GB20-20November 1997MCC Card Configuration5OverviewThis chapter describes the configuration options on the MCC card. Use theseoptions to c

Strona 114

MCC Card Configuration 5-28000-A2-GB20-20November 1997 ProcedureTo configure card information, DNS setup, time/date, clear NVRAM, upload ordownload c

Strona 115

MCC Card Configuration 5-38000-A2-GB20-20November 1997Table 5-1. Card Status Menu Options (2 of 3)Time/Date A-A-CGives the user the ability to configu

Strona 116

MCC Card Configuration 5-48000-A2-GB20-20November 1997Table 5-1. Card Status Menu Options (3 of 3)Card Reset (Reset System) A-A-FGives the user the ab

Strona 117 - DSL IP Router Screens

MCC Card Configuration 5-58000-A2-GB20-20November 1997MCC Configuration Ports Screens (Reserved for Future Use)NOTE:There are no configurable ports on

Strona 118

Contents iv8000-A2-GB20-20November 19978 Diagnostics and Troubleshooting Applications Screens 8-1. . . . . . . . . . . . . . . . . . . . . . . . . .

Strona 119

MCC Card Configuration 5-68000-A2-GB20-20November 1997Table 5-2. Interfaces Menu Options (2 of 2)IP Network A-C-BGives the user the ability to configu

Strona 120 - DSL Configuration RTU Screens

MCC Card Configuration 5-78000-A2-GB20-20November 1997MCC Configuration Users ScreensUse the system information submenu of the Users screens to config

Strona 121 - Applications Screens

MCC Card Configuration 5-88000-A2-GB20-20November 1997MCC Configuration IP Router ScreensUse the system information submenu of the IP Router screens t

Strona 122

MCC Card Configuration 5-98000-A2-GB20-20November 1997Table 5-4. IP Router Menu Options (2 of 4)Filter Table A-E-CDisplays an overview of the various

Strona 123 - Diagnostic Screens

MCC Card Configuration 5-108000-A2-GB20-20November 1997Table 5-4. IP Router Menu Options (3 of 4)IP Router Filters (IP Filter Configuration) A-E-CGive

Strona 124

MCC Card Configuration 5-118000-A2-GB20-20November 1997Table 5-4. IP Router Menu Options (4 of 4)ARP (Parameters, Add Entry, and Delete Entry) A-E-D (

Strona 125 - Troubleshooting

MCC Card Configuration 5-128000-A2-GB20-20November 1997MCC Configuration SNMP ScreensUse the system information submenu of the SNMP screens to configu

Strona 126 - Selftest

MCC Card Configuration 5-138000-A2-GB20-20November 1997Table 5-5. SNMP Menu Options (2 of 2)Communities/Traps (SNMP Communities/Traps) A-F-DGives the

Strona 127

MCC Card Configuration 5-148000-A2-GB20-20November 1997MCC DSL Cards ScreenUse the system information submenu of the DSL Cards screen to set IPaddress

Strona 128 - Minor Alarms

6-18000-A2-GB20-20November 1997DSL Card Configuration6OverviewThis chapter describes the non-mandatory configuration options on the DSL card.Use thes

Strona 129 - Failure Type Action

Contents v8000-A2-GB20-20November 1997C Download Code and Apply Download Download Code C-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Strona 130 - Network Problems

DSL Card Configuration 6-28000-A2-GB20-20November 1997NOTE:Only a user who logs on to the HotWire DSLAM with Administrativepermission can configure th

Strona 131 - Excessive Collisions

DSL Card Configuration 6-38000-A2-GB20-20November 1997Table 6-1. Card Status Options (2 of 4)Time/Date A-A-CGives the user the ability to configure th

Strona 132 - Filters Not Working

DSL Card Configuration 6-48000-A2-GB20-20November 1997Table 6-1. Card Status Options (3 of 4)NVRAM Config Loader A-A-EGives the user the ability to up

Strona 133 - No Response at Start Up

DSL Card Configuration 6-58000-A2-GB20-20November 1997Table 6-1. Card Status Menu Options (4 of 4)Download Code (Download Code and Apply Download) A-

Strona 134 - Large Number of TRAPS

DSL Card Configuration 6-68000-A2-GB20-20November 1997DSL Configuration Ports ScreensUse the system information submenu of the Ports screens to displa

Strona 135 - Unexpected Subnet Data

DSL Card Configuration 6-78000-A2-GB20-20November 1997Table 6-2. Ports Options (2 of 2)DSL Ports (DSL Parameters) (Continued) A-B-BBehavior – Fixed/Ad

Strona 136 - Checklist for Setting Up User

DSL Card Configuration 6-88000-A2-GB20-20November 1997DSL Configuration Interfaces ScreensUse the system information submenu of the Interfaces screens

Strona 137 - DSL User Accounts

DSL Card Configuration 6-98000-A2-GB20-20November 1997Table 6-3. Interfaces Options (2 of 3)IP Network A-C-BGives the user the ability to configure up

Strona 138 - Reboot Card (DSL)

DSL Card Configuration 6-108000-A2-GB20-20November 1997Table 6-3. Interfaces Options (3 of 3)PPP A-C-DGives the user the ability to configure paramete

Strona 139 - Features

DSL Card Configuration 6-118000-A2-GB20-20November 1997DSL Configuration Users ScreensUse the system information submenu of the Users screens to confi

Strona 140 - Enable DSL Port Traps

vii8000-A2-GB20-20November 1997About This GuideDocument Purpose and Intended AudienceThis guide describes how to configure and operate the software c

Strona 141 - Download

DSL Card Configuration 6-128000-A2-GB20-20November 1997DSL Configuration IP Router ScreensUse the system information submenu of the IP Router screens

Strona 142 - Apply Download

DSL Card Configuration 6-138000-A2-GB20-20November 1997Table 6-5. IP Router Options (2 of 4)Filter Table A-E-CDisplays an overview of the various filt

Strona 143 - Navigation Keys

DSL Card Configuration 6-148000-A2-GB20-20November 1997Table 6-5. IP Router Options (3 of 4)IP Router Filters (IP Filter Configuration) A-E-CGives the

Strona 144 -  Number of Auth failures

DSL Card Configuration 6-158000-A2-GB20-20November 1997Table 6-5. IP Router Options (4 of 4)ARP (Parameters, Add Entry, and Delete Entry) A-E-D (A-E-A

Strona 145 - Event CommentTrap Class

DSL Card Configuration 6-168000-A2-GB20-20November 1997DSL Configuration SNMP ScreensUse the system information submenu of the SNMP screens to configu

Strona 146

DSL Card Configuration 6-178000-A2-GB20-20November 1997Table 6-6. SNMP Options (2 of 2)Communities/Traps (SNMP Communities/Traps) A-F-CGives the user

Strona 147 - RTU Related Traps

DSL Card Configuration 6-188000-A2-GB20-20November 1997DSL Configuration DHCP Relay ScreensUse the system information sub-menu of the DHCP screens to

Strona 148 - 5446 RTU Setup

DSL Card Configuration 6-198000-A2-GB20-20November 1997Table 6-7. DHCP Relay OptionsDomain Names A-G-AThis screen is used for creating the DHCP Relay

Strona 149 - Network Management Systems

DSL Card Configuration 6-208000-A2-GB20-20November 1997DSL Configuration RTU ScreensUse the system information sub-menu of the RTU screens to configur

Strona 150 - MIB Browser Techniques

7-18000-A2-GB20-20November 1997Monitoring the HotWire DSLAM7OverviewThe HotWire DSLAM lets you to monitor the activity of the HotWire MCC andDSL card

Strona 151

About This Guide viii8000-A2-GB20-20November 1997Document SummarySection DescriptionChapter 1HotWire DSLAM System Description. Provides anoverview of

Strona 152 - IP and Device MIBs Supported

Monitoring the HotWire DSLAM 7-28000-A2-GB20-20November 1997MCC Monitoring Card Status ScreensUse the system information submenu of the Card Status sc

Strona 153

Monitoring the HotWire DSLAM 7-38000-A2-GB20-20November 1997Table 7-1. Card Status Options (2 of 2)Syslog B-A-CDisplays a timestamp sequential list of

Strona 154 - Static Route Warning Messages

Monitoring the HotWire DSLAM 7-48000-A2-GB20-20November 1997Table 7-2. Physical Layer Options (2 of 2)Ether Statistics (Ethernet Statistics) B-B-BDisp

Strona 155 - Glossary

Monitoring the HotWire DSLAM 7-58000-A2-GB20-20November 1997MCC Monitoring Interfaces ScreensUse the system information submenu of the Interfaces scre

Strona 156

Monitoring the HotWire DSLAM 7-68000-A2-GB20-20November 1997MCC Network Protocol ScreensUse the system submenu information of the Network Protocol scr

Strona 157

Monitoring the HotWire DSLAM 7-78000-A2-GB20-20November 1997Table 7-4. Network Protocol Options (2 of 6)UDP Statistics B-D-BDisplays information on UD

Strona 158

Monitoring the HotWire DSLAM 7-88000-A2-GB20-20November 1997Table 7-4. Network Protocol Options (3 of 6)TCP Data Stats (TCP Statistics) B-D-CDisplays

Strona 159

Monitoring the HotWire DSLAM 7-98000-A2-GB20-20November 1997Table 7-4. Network Protocol Options (4 of 6)TCP Connection Statistics B-D-CDisplays a summ

Strona 160

Monitoring the HotWire DSLAM 7-108000-A2-GB20-20November 1997Table 7-4. Network Protocol Options (5 of 6)ICMP Statistics (ICMP Packet Statistics) B-D-

Strona 161

Monitoring the HotWire DSLAM 7-118000-A2-GB20-20November 1997Table 7-4. Network Protocol Options (6 of 6)SNMP Authentication Statistics B-D-FThe SNMP

Komentarze do niniejszej Instrukcji

Brak uwag